HYDRAULIC DOCK LEVELER – HDL01ND
uses 1 hydraulic cylinder operated through the controller with simple operation. Equipped with a hydraulic cylinder for flexible lifting operations. Ability to resist deformation, minimize problems during operation.


ADVANTAGES
Save time – labor and increase safety when goods rotation…
The material is able to withstand fluctuations of external environmental conditions.
Made of wear-resistant stainless steel, the surface of the steel plate helps prevent slipping.
When there is a large gap between the truck floor and the floor of the warehouse with a large size, it will help reduce the slope when the lip Dock opens connecting to the truck floor.
Safety lock valve, control the lifting and lowering movement, limit risk during control.
Diverse for all types of the vehicle’s trunk.
Easy to install and operate (suitable for many users).
Produced according to European technology standards. Helping the factory to meet the safety standards in production operations: ISO 14000, ISO 45001: 2018, ROHS, HACCP, GMP…


Load capacity | 6000kg / 10000kg |
Raising/lowering range | ±300m |
Plat Thicknesss | 6 – 8mm |
Lip Thickness | 12 – 16mm |
Number of lifting cylinders | 1 – 2 |
Power motor | 0.75 – 1.1kW |
Power supply | 380V / 3 phase / 50Hz |
Control cabinet | IP54 protection against dust and water, equipped with emergency stop and push button |
Painting Thinkness | 60 – 90 micron |
Temperature range | -30°C – +50°C |
INSTALLATION
Model | Lifting Platform Dimension (mm) | Pit Dimension (mm) | Lip lift/lowering range (mm) | ||||||
DW | DL | DH | Lip | PW | PL | PH | Raising | Lowering | |
HDL-S106ND20186 | 1800 | 2000 | 600 | 400 | 1840 | 2010 | 610 | +300 | -300 |
HDL-S106ND25186 | 1800 | 2500 | 600 | 400 | 1840 | 2510 | 610 | +300 | -300 |
HDL-S106ND20206 | 2000 | 2000 | 600 | 400 | 2040 | 2010 | 610 | +300 | -300 |
HDL-S106ND20256 | 2000 | 2500 | 600 | 300 | 2040 | 2510 | 610 | +300 | -300 |
HDL-S106ND20306 | 2000 | 3000 | 600 | 400 | 2040 | 3010 | 610 | +300 | -300 |
DW: Dock width, DH: Dock height, DL: Dock length excluded, PW: Pit width, PH: Pit height, PL: Pit length |

Step 1: Build and complete the Dock pit
Build and complete the Dock pit in accordance with the selected Dock size. Iron frame V around the edge of the pit.


Step 2: Put the Dock in the installation position
Use a forklift or crane to put the Dock into the Dock pit. Depending on the mounting terrain, the Dock can be placed either vertically or horizontally.
Step 3: Welding to connect the Dock to the pit
Weld the dock frame edge to the V-panel of the Dock pit. Check for sure welds and ensure aesthetics. Check for vibration and safety while operating the Dock.

OPERATION INSTRUCTIONS
01/ Press and hold down ON button until Lip opens fully.
02/ Release ON button so that the platform and lip lower and reach the vehicle bed.
03/ Carry out the loading/unloading of goods.
04/ Press and hold down ON button until the platform is fully raised.
05/ Release ON button and lip automatically closes and the platform goes down fully, end the working process.
Navidock – Manufacturer and supplier of lifting solutions and conveying systems for goods & vehicles:
Dock leveller – Mobile Ramp – Dock Seal – Dock shelter – Dock Plates – Dock Boards – Dock House – Loading Bay
Website : www.navidock.vn
Reviews
There are no reviews yet.