HYDRAULIC DOCK LEVELER – HDL01ND
It is a device that connects the floor of a container or a different transport vehicle with the floor of the warehouse/receiving area. Helping to handle goods quickly, shorten the time, and save costs for businesses.


ADVANTAGES
Helping businesses save time, labor costs, and increase safety when goods rotation…
Hydraulic Dock Leveler has safety lock valve, controlling the lifting and lowering movements, reducing the risk during control.
Made of stainless steel, increases the ability to withstand fluctuations of external environmental conditions.
Made of abrasion-resistant stainless steel, the steel plate surface will have a grainy pattern that helps prevent slip.
Produced according to European technology standards, meeting ISO, ROHS, HACCP, GMP standards… ensuring absolute safety for users.


Load capacity | 6000kg / 10000kg |
Raising/lowering range | ±300m |
Plat Thicknesss | 6 – 8mm |
Lip Thickness | 12 – 16mm |
Number of lifting cylinders | 1 – 2 |
Power motor | 0.75 – 1.1kW |
Power supply | 380V / 3 phase / 50Hz |
Control cabinet | IP54 protection against dust and water, equipped with emergency stop and push button |
Painting Thinkness | 60 – 90 micron |
Temperature range | -30°C – +50°C |
INSTALLATION
Model | Lifting Platform Dimension (mm) | Pit Dimension (mm) | Lip lift/lowering range (mm) | ||||||
DW | DL | DH | Lip | PW | PL | PH | Raising | Lowering | |
HDL-S106ND20186 | 1800 | 2000 | 600 | 400 | 1840 | 2010 | 610 | +300 | -300 |
HDL-S106ND25186 | 1800 | 2500 | 600 | 400 | 1840 | 2510 | 610 | +300 | -300 |
HDL-S106ND20206 | 2000 | 2000 | 600 | 400 | 2040 | 2010 | 610 | +300 | -300 |
HDL-S106ND20256 | 2000 | 2500 | 600 | 300 | 2040 | 2510 | 610 | +300 | -300 |
HDL-S106ND20306 | 2000 | 3000 | 600 | 400 | 2040 | 3010 | 610 | +300 | -300 |
DW: Dock width, DH: Dock height, DL: Dock length excluded, PW: Pit width, PH: Pit height, PL: Pit length |

Step 1: Build and complete the Dock pit
Build and complete the Dock pit in accordance with the selected Dock size. Iron frame V around the edge of the pit.


Step 2: Put the Dock in the installation position
Use a forklift or crane to put the Dock into the Dock pit. Depending on the mounting terrain, the Dock can be placed either vertically or horizontally.
Step 3: Welding to connect the Dock to the pit
Weld the dock frame edge to the V-panel of the Dock pit. Check for sure welds and ensure aesthetics. Check for vibration and safety while operating the Dock.

OPERATION INSTRUCTIONS
01/ Press and hold down ON button until Lip opens fully.
02/ Release ON button so that the platform and lip lower and reach the vehicle bed.
03/ Carry out the loading/unloading of goods.
04/ Press and hold down ON button until the platform is fully raised.
05/ Release ON button and lip automatically closes and the platform goes down fully, end the working process.
Navidock – Manufacturer and supplier of lifting solutions and conveying systems for goods & vehicles:
Dock leveller – Mobile Ramp – Dock Seal – Dock shelter – Dock Plates – Dock Boards – Dock House – Loading Bay
Website : www.navidock.vn
Reviews
There are no reviews yet.